One of the most frequent tasks for any manager is “planning”, be it putting together a hiring schedule or designing a jumbo jet, it all starts with a simple project plan and gantt chart is simple and intuitive representation of the same. But how to make a gantt chart in excel without writing too many formulas or adding conditional formats? Do not worry! with the simple trick we are going to learn today, you will be able to “gantt in 60 seconds” 🙂


You dont have even 60 seconds, worry not, download the free gantt chart template and get your project plan ready in 6 seconds.


For our example purposes, we will look at a fictitious project plan shown below:

project plan data table excel

Even though you can use this trick to pretty much any data format, it works better when the project plan is structured around how I represented it above.

Now lets build a gantt chart in 60 seconds, get your stopwatches out and get, set …. GO!

1. Create a bar graph

Select the data part of your plan (ie all the cells except header row in the above table) and click on chart icon in excel. Select “bar chart” as chart type and “stacked bar 2d” as sub-type (2nd left on the top row) as shown here.

create excel gantt chart with bar graphs

Click finish. At this point your gantt chart should look like this:

1-gantt-chart-in-excel

2. Transform your bar graph to gantt chart

Now we will convert this stacked bar graph to a gantt chart by using chart formatting options.

  • First we will reverse the way data is charted, so that it looks like a gantt chart. For this we need to right click anywhere on the “y-axis” of the graph and select “format” option. Go to “scale” tab and check “Categories in reverse order” option.
    EXCEL CHART SCALE OPTIONS

    Click ok, now out gantt chart should look like this:

    2-gantt-chart-in-ms-excel

    btw, what is the time on that stop clock, 34 seconds, well, thats just fine, we have got plenty of time to spruce this up.

  • Now, lets get rid of first data series so that our graph looks more like gantt chart. Select the first data series of your chart (should be in violet blue color 🙂 ), right click and go to “format data series” option.
    4-format-first-stack-in-chart

    Select “none” for “border” and “area” options in the “patterns” tab. This will make sure that the first series is invisible, so we see second data series floating on the chart, thus making it look almost like a gantt chart.

    5-remove-background-lines

    Go to “data labels” tab and check “category name” option. This will make sure our gantt chart will show labels (but on the now invisible first data series)

    6-show-data-labels

    Click ok, at this point our gantt chart should look like this:

    Gantt chart in microsoft excel graphs - how to?

  • Finally we will adjust labels and backgrounds to convert this to a perfect gantt chart
    1. First lets remove the legend box on the right by selecting it and hitting “del” key.
    2. Now, lets also remove the y-axis since labels are visible on data-series 1. Just click on the y-axis (or category axis) and hit “del” again.
    3. Lets adjust the alignment of the data labels on series 1 so that they are properly visible. Right-click on the data labels and select “format” option. Go to “alignment” tab in the dialog and select “Right” for horizontal alignment and “inside end” for label position. This will ensure that our data labels are right aligned and shown at the end of data series 1, ie closer to the actual series 2 (duration of the task). See the below screen cap for more help.

      7-adjust-alignments for data labels in excel charts

    4. Lets also remove the plot back ground to remove the annoying grey color from our gantt chart. Just click on the grey color anywhere and hit “del”. While we are at it, you can also change the line color of x-axis (the days) to white or transparent to reduce the eye sore.
    5. Finally, lets adjust the plot area size so that we can read all the data labels and everything looks normal.

    At this point our gantt chart should look something like this:

    gantt chart in excel spreadsheets download

    If you still have few seconds left, you can tweak the chart format to make it look better. I had 3 more seconds left, so I tried this 🙂

    final-excel-gantt-chart


Feel free to download the free gantt chart template and see how to create gantt charts using excel bar graphs.


Bonus tips for enthusiastic excel experimenters:
1. Adjust the grid line format to make them more subtle
2. Select a particular task’s data point and change its color to emphasize progress / stalled statuses
3. Enhance this to add another column with no. of resources (or difficulty etc.), add this to the stacked chart and make it invisible just like series 1, but show the data labels.
4. You get the picture… so start gantting… 😀


Also read:

Learn how to create project plans / gantt charts using conditional formatting
Create art grade excel charts with these 73 designer templates
Other uber cool excel tricks to make your colleagues zealous and your boss happy

Facebook
Twitter
LinkedIn

Share this tip with your colleagues

Excel and Power BI tips - Chandoo.org Newsletter

Get FREE Excel + Power BI Tips

Simple, fun and useful emails, once per week.

Learn & be awesome.

Welcome to Chandoo.org

Thank you so much for visiting. My aim is to make you awesome in Excel & Power BI. I do this by sharing videos, tips, examples and downloads on this website. There are more than 1,000 pages with all things Excel, Power BI, Dashboards & VBA here. Go ahead and spend few minutes to be AWESOME.

Read my storyFREE Excel tips book

Overall I learned a lot and I thought you did a great job of explaining how to do things. This will definitely elevate my reporting in the future.
Rebekah S
Reporting Analyst
Excel formula list - 100+ examples and howto guide for you

From simple to complex, there is a formula for every occasion. Check out the list now.

Calendars, invoices, trackers and much more. All free, fun and fantastic.

Advanced Pivot Table tricks

Power Query, Data model, DAX, Filters, Slicers, Conditional formats and beautiful charts. It's all here.

Still on fence about Power BI? In this getting started guide, learn what is Power BI, how to get it and how to create your first report from scratch.

22 Responses to “Master Excel 2007 Ribbon with this Free Learning Guide”

  1. Finnur says:

    Thank you, kind sir. Well done with the baby making.

  2. doug churchill says:

    I cannot get signed up for your newsletter. I tied both this email address and churchill2001@hotmail.com. never a response.

  3. doug churchill says:

    I cannot get signed up for your newsletter. I tied both this email address and churchill2001_at_hotmail_dot_com. never a response for either attempt.

    • Chandoo says:

      @Doug, it shows that your email address is pending verification. Can you check your inbox (and may be spam folder too) for an email from me? The subject will be "Activate Subscription to Get your Free Excel Tips E-book"

  4. ajay says:

    Very Useful Info..Keep it up..

  5. Chandoo says:

    @Ajay.. you are welcome 🙂

  6. [...] Excel 2010 UI looks considerably better and less stressful than 2007. The colors are dull and subtle. The icons don’t call for attention unless you want to do something. The menus / ribbons feel smoother and slicker. [Learn to use Excel Ribbon with this Free e-Book] [...]

  7. Mark says:

    I can't open this pdf. I get the error message:

    You do not have the required license to open this file.

    Please request a license from the creator of the file, and add it using the license manager and they try opening it again.

    What gives??

  8. Mark says:

    I downloaded the file again and it worked this time. Strange. (First file was 116 KB, second was 1644 KB... ???)

  9. Michael says:

    Hi Chandoo,
    thanks for sharing your Excel 2007 learning experience with us; unfortunately the link to the pdf of the free Excel 2007 learning guide seems broken: my Acrobate Readers flags: "Unkown file type or corrupte data".
    Have a nice day
    Michael

  10. anja says:

    well done this is great

  11. Fabian says:

    Can somebody just provide a link the classic TAB exportedUI files for MS Office 2003 for us to use in office 2007/2010?. searching online, everybody just wnats to make a buck online with silly Classic Tab installers which do nothing more than inport exportedUI files for you.

    Don't give me a ribbon how to guide, just give me free exportedUI files. I should not have to pay anyone for this, it is free XML, MS should have included this to begin with.

  12. rocky says:

    thanks

  13. kartik says:

    Dear.
    There are a set of debit values and a set ot credit values in a column. I want a vba code by whcich the debit value plus a single / multiple credit value is zero that needs to be marked .
    finally i will come to know out of the avaibale debits which cannot be used the with avilable credits either single or multiple values.
    If multiple matching sets are available let it take the 1st or the 2nd one its not an issue.
    Column A Ref
    -1000 A
    -5000 B
    -8000 C
    800 A
    100 A
    100 A
    2000 B
    3000 B
    13000
    15000

  14. ridwan says:

    hi...
    how to make this add-ins and display in ribbon... check this sample : http://www.cprsoft.com/GCDemo01.htm
    thank you sir...
     

  15. Aleem Qamar says:

    Please tell me format painter short cut key In excel ?
    Thanks In Advance

  16. mano says:

    thankfully.likeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee

  17. Gift Miag Mentor says:

    I am very much happy for such a great opportunity given to excel learners to advance their skills for the betterment of the future. I am a great user of this site and feel proud to have come across this web site.
    I appreciate this, because I didn't do much works in my project management studies using gantt chart. As of now are have now learned some advancement.

Leave a Reply