I need to be able to instantly know of a project is at risk by not receiving details within 7 days of install
I have added an example
In column N, I want it to show "check"
if the install date in P is within the next 7 days (and gone past the date in P (if possible)
of M does not say Yes
I am struggling with the date bit
once I have that I can set conditional formatting to highlight even more
I have added an example
In column N, I want it to show "check"
if the install date in P is within the next 7 days (and gone past the date in P (if possible)
of M does not say Yes
I am struggling with the date bit
once I have that I can set conditional formatting to highlight even more