• Hi All

    Please note that at the Chandoo.org Forums there is Zero Tolerance to Spam

    Post Spam and you Will Be Deleted as a User

    Hui...

  • When starting a new post, to receive a quicker and more targeted answer, Please include a sample file in the initial post.

Progress Chart for Road works

Status
Not open for further replies.
Hi,

while i changed the input data in the attached manner, observed that Last entry code (i.e. "SG-TOP FDD") is being reflected as "top layer".

But in actual, My top layer is "SH-GRANULAR" as shown in sheet "Order of priority"

With input data given in attached file, The output in column CO - CR of "output" sheet has to be " 1. 26970 - 27280 BC "

attached the file for your review.

Thanks
Ashok
 

Attachments

  • Order of priority.xlsb
    693.9 KB · Views: 148
@ashokkumarkolla
Have You read my messages #42?
That order has told with 'data input'!
If You make steps: 1st DBM, 2nd BC and 3rd C&C ( no matter if possible or not!)
Then the top layer is C&C!
If You make steps: 1st BC, 2nd C&C and 3rd DBM, then the top layer is DBM!
If one year later step BC-CORE, then it will be the top layer!
If one year later step C&C, then it will be the top layer!
or is it BC-CORE? no way !
or do You really mean that after SH-GRANULAR, it will be ALWAYS the top layer?
... no matter what ever needs to work after that ...
if so, then this is 'Mission impossible!'
and You should ask 'Tom Cruise' to solve this!
 
Hi,

So i understood that i was trying "Mission Impossible", and i was unnecessarily wasting your precious time.

Any way, you have provided a method to work further on my project.

Many thanks to you.
Ashok.
 
Hi,

While working with Strip chart, I have encountered a mistake in Sl no.2 of column "CP" of output sheet.

For the given input, the output should have been like this

1. 31345 - 31970 - DBM-CORE
2. 31970 - 32640 - DBM

But From chainage in Sl no:2 is showing as 31975 instead of 31970.


i could not sort out the issue and finally turned to you.

Thank you
Ashok
 

Attachments

  • Strip Chart.xlsb
    701.7 KB · Views: 141
@ashokkumarkolla
You ended this case then it was in preview-mode.
That means, even I haven't check code.
Preview really means preview,
then there not necessary be real results.
I changes one thing and that part should work better now.

... hint: I'm not so sure,
that is it good idea to add some shapes 'outside of my code'.
Of course, You can do so.
There are like rules, how do 'my code' work with shapes.
actually not only 'my code made shapes', all possible shapes.
You could get easy the endless loop.
or
few thousands extra shapes,
which have to delete manually one-by-one.
 

Attachments

  • Strip Chart.xlsb
    684.2 KB · Views: 55
Hi,

Pl check the output, In Sl No.1 of Column CO, the data is

9890 to 11410 DBM (This is OK)

In Sl No.2, the data is

20220 to 20840 BC.

I have observed an error "between 11410 to 20220 the data is not showing".
where as the data is shown in columns BS to CC & Top layer strip chart is shown correctly.

Missing data in Column CO is:-

12020 to 13080 DBM

20190 to 20220 DBM.

Thanks
Ashok.
 

Attachments

  • Strip Chart.xlsb
    718.2 KB · Views: 30
@ashokkumarkolla
As I tried to wrote in previous reply.
This is still 'in preview'-mode.
The term 'error' is wrong.
This code is not ready!
I add one more 'need to have rows' in same time.
 

Attachments

  • Strip Chart (1).xlsb
    705 KB · Views: 47
Hello Friends,

Am very happy for being a member in this group. Since so many years am hardly trying to find out the easy process for preparing/update strip chart like this but i was failed :(

Luckily i found this forum through Google.

here is my problem

am using the same file for updating status of Highways as well as for RCC Cover drains also just by changing headings in output sheet. But the problem is in some locations the top level showing DBM & BC (if i use for highways or drains) at column co.

if i am using this file for RCC Cover drain status, in this whole document am not mentioned any where such as DBM or BC in this file. But still on LHS side it is showing in some locations are as DBM & BC are the top levels. on RHS it is not showing top level as a BC & DBM.

i think on RHS side is pretty good for accurate update.
but on LHS side needs some correction for more accurate output.

the file is enclosed for reference.

Please help me in this regard.

Thanks in advance.
 

Attachments

  • Drain Strip Chart.xlsb
    828.2 KB · Views: 62
1) ReRead #52 Reply, That order has told with 'data input'!
2) Do You use those codes that You're writing in that file? > How possible?
 
Thank you Mr. Vletm for your reply.

yes am following the sequence for data input and the same code name also changing in the strip chart heading (in Output tab)

Am very comfortable with this strip chart.

only if there is no status given in my input but still it shows me DBM & BC. If u check the same chainages of DBM & BC which is showing in top layer you cant find those chainages in my input.
 
1) Did You press 'BOXES' before cleared old data from sheets?
2) ReRead #57 Reply. This was not ready! This is not ready!
There can still be some interesting 'things'. I found one!
>>> for testing ...
 

Attachments

  • Drain Strip Chart.xlsb
    729.9 KB · Views: 90
Hello Mr. Vletm thanks the last attachment is working :)
Am proud to be bowing for you and your extra ordinary skills :)
I aware about reply no 57. for your information the file which I was enclosed in reply no 62 has downloaded from reply no. 60
And one more thing i observed tmp sheet. In that there is "13.5", "Valid Overlapping" & "Scale" may i know what are those things needs to be use??
If i need this strip chart with 50m or 100m interval can i change that? if possible how & where?
 
Hi,

I am working in highway project and needs to update progress the progress of road works on day to day basis.

I had attached the file for your reference.

In sheet "data Input" is being entered in the format specified.

I need to update sheet "update the output chart format" each and every day, so i request to help me in automating this process.

I had tried and spend time in solving this time consuming process, and searched the web also.

Please help me.

Thanks in advance,
ashok


Thank you Mr. Ashok because the first person who asks for the strip chart in this forum. Because of you today i got an extra ordinary strip chart with help of Mr. Vletm. Thank you to both of you. :)
 
"13.5" is so called Y-scale fixing 'scale'.
It depends which Excel-version You're using.
Maybe now those 'boxes' look to be in correct position, but if You change another Excel-version maybe needs to fix Y-scale manually.
"Valid Overlappings" ...
Normally there are not 'overlaps' with 'data inputs' but
If needed two or more 'data input' From-To always overlaps with other row information like From 10+000 .. 12+000 and next row 11+000 .. 13+000 then there is possible to accept (make valid overlapping) those rows.
"50m or 100m" interval:
Many things are possible, but it would need hours of work.
... and more more hours with testing.
 
"13.5" is so called Y-scale fixing 'scale'.
It depends which Excel-version You're using.
Maybe now those 'boxes' look to be in correct position, but if You change another Excel-version maybe needs to fix Y-scale manually.
"Valid Overlappings" ...
Normally there are not 'overlaps' with 'data inputs' but
If needed two or more 'data input' From-To always overlaps with other row information like From 10+000 .. 12+000 and next row 11+000 .. 13+000 then there is possible to accept (make valid overlapping) those rows.
"50m or 100m" interval:
Many things are possible, but it would need hours of work.
... and more more hours with testing.

Sorry for delay in reply
Thanks for your afford :)
 
i want to use this strip chart to monitor the project.
I want to add some extra layers.
How can i add this in strip chart?
 
PRO
1st sentence - okay.
2nd - If I remember about 2yrs old code
... extra layers would be a challenge. Do You need to use all 'old' layers?
3rd - You can add, but it won't work without hours and hours coding.
 
Ok Sir,

You have any new this type of format (strip chart) which helps me in Road (Highway & Structures Work) monitoring.
 
Status
Not open for further replies.
Back
Top