Hi Friends,
Can any one help me on this. multips date validateion in a cell.if there is only one date to validate, i should have used Data-validation-date-between.
I have in the sheet2 leaveplan from date in the C5:C100 and to date in the D5:D100
In the another Sheet1 'from date in the A5:A50': and 'to date in the B5:B50'
When i enter the date in the sheet2, it should not allow to enter the date if it is falling between date mention in the sheet1.
Regards
Abdul
Can any one help me on this. multips date validateion in a cell.if there is only one date to validate, i should have used Data-validation-date-between.
I have in the sheet2 leaveplan from date in the C5:C100 and to date in the D5:D100
In the another Sheet1 'from date in the A5:A50': and 'to date in the B5:B50'
When i enter the date in the sheet2, it should not allow to enter the date if it is falling between date mention in the sheet1.
Regards
Abdul