i got a problem .
I want to make a machine loading plan and for that i need to sum till 24 hours cycle time in which various small cycles can be included.
ex+
I have 4 products whose cycle time are:-
A 6 HRS
B 8 HRS
C 18 HRS
D 32 HRS
NOW I WANT TO SUM UP THESE HOURS TILL 24 AND REMAINING HOURS TO BE ADDED FOR NEXT SUM UP I.E.
1ST SUM UP A 6+B 8+C10 =24
2ND SUM UP C 8+D 16 =24
3RD SUM UP REMAINING 16+SO ON
WITH THEIR INDEX NUMBER I.E. INDICATION A, B,C,D
THANKS
DEAR NARAYAN THANKS FOR QUICK RESPONSE
NARAYAN HAS UNDERSTOOD IT CORRECTLY . THAT THE MAIN PROBLEM IS MAKING A BATCH OF 24 HRS AND CARRY FORWARDING THE REST HOURS TO THE NEXT 24 HRS BATCH AND SO ON.
ex
given data
product hr for production
name
a 5
b 20.5
c 1
d 2.5
e 20
f 6
g 20
and the require solution is
1st day a 5
b 19
2nd day b 1.5
c 1
d 2.5
e 19
3rd day e 1
f 6
g 17
4th day g 3
I want to make a machine loading plan and for that i need to sum till 24 hours cycle time in which various small cycles can be included.
ex+
I have 4 products whose cycle time are:-
A 6 HRS
B 8 HRS
C 18 HRS
D 32 HRS
NOW I WANT TO SUM UP THESE HOURS TILL 24 AND REMAINING HOURS TO BE ADDED FOR NEXT SUM UP I.E.
1ST SUM UP A 6+B 8+C10 =24
2ND SUM UP C 8+D 16 =24
3RD SUM UP REMAINING 16+SO ON
WITH THEIR INDEX NUMBER I.E. INDICATION A, B,C,D
THANKS
DEAR NARAYAN THANKS FOR QUICK RESPONSE
NARAYAN HAS UNDERSTOOD IT CORRECTLY . THAT THE MAIN PROBLEM IS MAKING A BATCH OF 24 HRS AND CARRY FORWARDING THE REST HOURS TO THE NEXT 24 HRS BATCH AND SO ON.
ex
given data
product hr for production
name
a 5
b 20.5
c 1
d 2.5
e 20
f 6
g 20
and the require solution is
1st day a 5
b 19
2nd day b 1.5
c 1
d 2.5
e 19
3rd day e 1
f 6
g 17
4th day g 3