ashish mehra
Active Member
Hi,
We are facing 3 issues as of now:
1) Back Date Entry posted in system
2) Change in Loan Amount
3) Change in Loan Start Date column
Explaination:
Point# 1) There is a bug in our system that is allowing back date entry posting manually in system by Operation team. Till the system is developed we have to find manual way.
Point# 2) Initially Disbursed amount is 50k but after 2-3 months this could be 20k in addition to initial amount. We refer these as Partial Disbursed booked deals.
Point# 3) We have found that in some scenarios Loan Start Date is changed due to Partial Disbursed deals.
We have to make a model to overcome the above conditions in Volume Report.
Regards,
AM
We are facing 3 issues as of now:
1) Back Date Entry posted in system
2) Change in Loan Amount
3) Change in Loan Start Date column
Explaination:
Point# 1) There is a bug in our system that is allowing back date entry posting manually in system by Operation team. Till the system is developed we have to find manual way.
Point# 2) Initially Disbursed amount is 50k but after 2-3 months this could be 20k in addition to initial amount. We refer these as Partial Disbursed booked deals.
Point# 3) We have found that in some scenarios Loan Start Date is changed due to Partial Disbursed deals.
We have to make a model to overcome the above conditions in Volume Report.