Like busses these questions. I had a look in the tutorials but am a little stuck.
I need to do a calulation that calculates the % mass loss of a material over time. The sheet looks something like this.
Cell A1 - Start mass
Cell B1 - Mass after 1 hour
Cell C1 - mass after 2 hours etc
etc
Cell F1 - % change of the last reading (once it reaches a point I'll stop measuring)
So the range is dynamic and I'm not sure which function to use. I'd like to be a bit clever and not do it by using a calulator as there are potentially a load of rows.
Hope it makes sense...Alex
I need to do a calulation that calculates the % mass loss of a material over time. The sheet looks something like this.
Cell A1 - Start mass
Cell B1 - Mass after 1 hour
Cell C1 - mass after 2 hours etc
etc
Cell F1 - % change of the last reading (once it reaches a point I'll stop measuring)
So the range is dynamic and I'm not sure which function to use. I'd like to be a bit clever and not do it by using a calulator as there are potentially a load of rows.
Hope it makes sense...Alex