• Hi All

    Please note that at the Chandoo.org Forums there is Zero Tolerance to Spam

    Post Spam and you Will Be Deleted as a User

    Hui...

  • When starting a new post, to receive a quicker and more targeted answer, Please include a sample file in the initial post.

solver problem - need help

Status
Not open for further replies.

Saranga

New Member
Please remember to follow all forum rules: Cross-posting
Note : Please do this Assignment in Excel using solver and submit the excel file.
Thapar theatre company needs to determine the lowest cost production budget for an upcoming theatre show. Specifically, they will have to determine the lowest which set pieces to construct and which pieces must be rented from another company at a pre-determined fee. The time available for constructing the set is two weeks after which rehearsals commence. To construct the set, the theatre has two part-time carpenters who work upto 12 hours a week and each at Rs 100 per hour. Additionally, the scene artist can work 15 hours per week at Rs 150 per hour
The set design requires 20 walls, 2 hanging drops with pained scenery and 3 large wooden tables serving as props. The number of hours required for each piece for carpentry and painting is given below.


CarpentryPainting
Flats0.52.0
Hanging Drops2.03.0
Wooden Tables(props)3.04.0
Flats, hanging drops and props can also be rented at a cost of Rs 750, Rs 5000 and Rs 3500 each.

How many of each unit should be built by the theatre company and how many units should be rented to minimize costs?
 
Cross-posted (and solved)
 
Status
Not open for further replies.
Back
Top