urbannomad
New Member
Hi,
I absolutely love this site! I am wondering if anyone can help me with a problem.
I have lots of projects that have gone through phases (A,B,C); and what i want to do is chart them on a chart. And look at their percentage differences from Phase A as well as final costs. I have their (ABC) costs, and want to select all these data points and have them be on a chart, with the Y axis being percentage and the X axis being each of the phases + the final cost.So we'd basically be looking at phase cost growth, correct? Any help?
I absolutely love this site! I am wondering if anyone can help me with a problem.
I have lots of projects that have gone through phases (A,B,C); and what i want to do is chart them on a chart. And look at their percentage differences from Phase A as well as final costs. I have their (ABC) costs, and want to select all these data points and have them be on a chart, with the Y axis being percentage and the X axis being each of the phases + the final cost.So we'd basically be looking at phase cost growth, correct? Any help?