rush2rajen
Member
Hi Excel Gurus,
I want to plot my final scores on the graph by drawing a horizontal line from the PEOPLE score ( vertical axis) to the right of the matrix and drawing a vertical line from the TASK score on the horizontal axis to the top of the matrix . Then draw two lines from each dot until they intersect. The area of intersection is the leadership dimension that you operate out of.
Request you to kindly help in creating this and if you can help by writing step wise that will be helpful.
Thanks
Raj
I want to plot my final scores on the graph by drawing a horizontal line from the PEOPLE score ( vertical axis) to the right of the matrix and drawing a vertical line from the TASK score on the horizontal axis to the top of the matrix . Then draw two lines from each dot until they intersect. The area of intersection is the leadership dimension that you operate out of.
Request you to kindly help in creating this and if you can help by writing step wise that will be helpful.
Thanks
Raj