Dear Sifus,
I have this calculation of production time as below.
[pre]
[/pre]
*The result for this formula will be (720) min.
I need the result to be in positive sign.
Can any sifus suggest the formula for this calculation?
Thank you.
I have this calculation of production time as below.
[pre]
Code:
Time Start Time End Total Time (Min)
8.00 17.00 =(17-8)*60
= 540
Time Start Time End Total Time (Min)
20.00 8.00 =(8-20)*60
= (720)
*The result for this formula will be (720) min.
I need the result to be in positive sign.
Can any sifus suggest the formula for this calculation?
Thank you.