Hi there-
I have 2 sets of data/series...Actuals & Projected. What I'm trying to do is have 1 line on the graph where Actuals show Jan-Aug, then, Projected shows Sept-Dec. For every actuals month, I've set the projected values to 0, but, at the aug/sept junction the graph spikes way up and there's a gap between the two lines. How can I connect them? The lines are two different colors, and I'd like just 1 line with no break.
Thanks
3G
I have 2 sets of data/series...Actuals & Projected. What I'm trying to do is have 1 line on the graph where Actuals show Jan-Aug, then, Projected shows Sept-Dec. For every actuals month, I've set the projected values to 0, but, at the aug/sept junction the graph spikes way up and there's a gap between the two lines. How can I connect them? The lines are two different colors, and I'd like just 1 line with no break.
Thanks