I need to create a sheet/table showing capacity for machines on first and second shifts and I need to compare usage to available capacity in both whole numbers and percentages. We will always fill first shift to capacity (100%) before producing on second shift. I need formulas for:
Capacity used on 1st shift: production units required up to shift capacity
Capacity used on 2nd shift: remaining production units required left over from 1st (over 100%) if needed, otherwise, 0.
% of Capacity used on 1st shift: % of needed / total capacity up to 100%
% of Capacity used on 2nd shift: remaining % left over from 1st (over 100%) if needed, otherwise, 0.
I have data for forecast total (required) and capacities for both shifts.
Thank you.
Capacity used on 1st shift: production units required up to shift capacity
Capacity used on 2nd shift: remaining production units required left over from 1st (over 100%) if needed, otherwise, 0.
% of Capacity used on 1st shift: % of needed / total capacity up to 100%
% of Capacity used on 2nd shift: remaining % left over from 1st (over 100%) if needed, otherwise, 0.
I have data for forecast total (required) and capacities for both shifts.
Thank you.