I have a sheet with the following fields
Job name, start date, duration(days), daily production
There are numerous jobs starting over time. some now() some into the future
I'd like to be able to produce a table that plots out each job over time and allocates a days production until the end date,
I can get a gant chart working but what im struggling with is to get the production summarised so i can see the total production from all the jobs at any point in time.
Ultimately the aim is to be able to plot the production over time (in days)
Job name, start date, duration(days), daily production
There are numerous jobs starting over time. some now() some into the future
I'd like to be able to produce a table that plots out each job over time and allocates a days production until the end date,
I can get a gant chart working but what im struggling with is to get the production summarised so i can see the total production from all the jobs at any point in time.
Ultimately the aim is to be able to plot the production over time (in days)