PierremontQuaker03
Member
Hi,
thanks for looking, I have been asked to provide a waterfall for the EBIT bridge from the FC25/26 to Budget 26/27 (see BCF & EBIT Bridge tab).
So I have done this, but have been told that the presentation of the Waterfall I have done looks rough - how can I improve how it looks do you think?
Also I have been asked for a waterfall for revenue and VP% please, so 2 additional tabs, so 3 waterfalls in total. How would I go about these additional two waterfalls, had my confidence knocked a bit!
Thanks
thanks for looking, I have been asked to provide a waterfall for the EBIT bridge from the FC25/26 to Budget 26/27 (see BCF & EBIT Bridge tab).
So I have done this, but have been told that the presentation of the Waterfall I have done looks rough - how can I improve how it looks do you think?
Also I have been asked for a waterfall for revenue and VP% please, so 2 additional tabs, so 3 waterfalls in total. How would I go about these additional two waterfalls, had my confidence knocked a bit!
Thanks