Hi All,
I have a process with many sub-processes. Subprocesses (SB) measured in [minutes:second] format.
I’d like to visualize the data, but there are some parallel or overlapped subprocesses.
As you can see in the linked picture, my problem is that the SB5 is starting earlier than the SB4 is finishing.
Is there any good way to visualize this?
http://tinypic.com/r/15ygs3t/7
I have a process with many sub-processes. Subprocesses (SB) measured in [minutes:second] format.
I’d like to visualize the data, but there are some parallel or overlapped subprocesses.
As you can see in the linked picture, my problem is that the SB5 is starting earlier than the SB4 is finishing.
Is there any good way to visualize this?