Hi,
we want to get a script written for breaking up the demands to daily buckets scheduling.
Briefing out the scenario model that is attached along with this.
We have products called A,B,C.
Against which has demands and these are manufactured on a filling line.
Every product is attributed with a Minimum run and a maximum run.
Output capacity per day per hour is also noted
Between every product changeover there is a cleaning portfolio to be carried over which is described with a cleaning matrix.
Required output model is also noted.
Regards,
Prashant
we want to get a script written for breaking up the demands to daily buckets scheduling.
Briefing out the scenario model that is attached along with this.
We have products called A,B,C.
Against which has demands and these are manufactured on a filling line.
Every product is attributed with a Minimum run and a maximum run.
Output capacity per day per hour is also noted
Between every product changeover there is a cleaning portfolio to be carried over which is described with a cleaning matrix.
Required output model is also noted.
Regards,