mahaveer Member Dec 17, 2012 #1 i want to put a vba code in sheet1_change that A2 value must be in date format ie. mm/dd/yyyy only otherwise the value of A2 will be nil always.
i want to put a vba code in sheet1_change that A2 value must be in date format ie. mm/dd/yyyy only otherwise the value of A2 will be nil always.