Murari Rajagopalan
Member
Please find attached the excel file which has the tickets closure time. Based on the closure time and priority, the performance rating should be captured based on the performance rating calculation as outlined in Colum J, K, L. Can you please help me with a formula where in the perfornance rating can be calculated automatically ?
thank you very much.
thank you very much.