Hello !!!
I'm trying to find a way out to identify the mismatches of production batch code with production date.
Here is the sample attached-
In the attached file,
the batch number 170141 should come after 170132. but as some mismatch is happened, it has now become like that. Now I need to find a way/ formula to identify this type of mismatch from huge number of data.
Please help me to sort this out.
Thanks a lot
Shuvro
I'm trying to find a way out to identify the mismatches of production batch code with production date.
Here is the sample attached-
In the attached file,
the batch number 170141 should come after 170132. but as some mismatch is happened, it has now become like that. Now I need to find a way/ formula to identify this type of mismatch from huge number of data.
Please help me to sort this out.
Thanks a lot
Shuvro