MY QUESTION IS AS FOLLOWS
A B C
1 EQUIPMENT NAME Flow hrs Cum-ve hrs[ 0.5 Hrs = 30 Min ]
2 PUMP A 24.00 480.00
3 PUMP B 24.00 480.00
4 PUMP C 24.00 480.00
5 PUMP D 24.00 480.00
6 PUMP E 24.00 480.00
ASSUME THE ABOVE DATA FOR THE DATE 20/11/2011(24*20DAYS=480.00)
NOW THE PUMP C RUN ONLY FOR 06 HRS ON 21/11/2011 SO THE CELL B4 WILL BE 06.00 FOR THE NEXT DATE
WHAT FORMULA I SHOULD USE IN CELL C4 SO THAT IT WILL ADD 06+480(VALUE OF 20/11/2011) AND GIVE RESULT AS 486
A B C
1 EQUIPMENT NAME Flow hrs Cum-ve hrs[ 0.5 Hrs = 30 Min ]
2 PUMP A 24.00 480.00
3 PUMP B 24.00 480.00
4 PUMP C 24.00 480.00
5 PUMP D 24.00 480.00
6 PUMP E 24.00 480.00
ASSUME THE ABOVE DATA FOR THE DATE 20/11/2011(24*20DAYS=480.00)
NOW THE PUMP C RUN ONLY FOR 06 HRS ON 21/11/2011 SO THE CELL B4 WILL BE 06.00 FOR THE NEXT DATE
WHAT FORMULA I SHOULD USE IN CELL C4 SO THAT IT WILL ADD 06+480(VALUE OF 20/11/2011) AND GIVE RESULT AS 486