Search results

  1. C

    Non ascending order lookup - Electrical Pipe Scheduling

    Thanks for all this guys, just back form site now, starting pulling cables tomorrow so might have to test at the weekend....
  2. C

    Non ascending order lookup - Electrical Pipe Scheduling

    SHEET 1 A B C D E F G 1 Cable DP1 DP2 DP3 DP4 DP5 DP6 2 P23 1 2 3 4 5 6 3 G10 1 5 - 2 3 4 4 P24 1 2 3 - 5 4 5 C29 1 - - 2 3 4 6 P25 1 4 3 2 - - 7 CR11 - - 1 2 3 - 8 C31 - 1 - 3 2 - I then have a...
  3. C

    Non ascending order lookup - Electrical Pipe Scheduling

    hi Hui, the route for G10 is DP1, DP4, DP5, DP6, DP2. But I understand where your confusion is, How would one insert tabs or more spaces into a post?? The example as I read it now is more confusing than it should be...
  4. C

    Non ascending order lookup - Electrical Pipe Scheduling

    I am trying to have a sheet for each draw pit. On this sheet there is a list of cables. I need to show on this sheet, what draw pit the cable has come from and where the draw pit is going.
  5. C

    Non ascending order lookup - Electrical Pipe Scheduling

    HI Guys. I am an Mechanical engineer doing cabling schedules around a site, All these cables go though draw pits (DP) or man holes. I can show what cables are in each draw pit. What I have to show is what draw pit the cable has come form and where it is going to. My problems is that these...