I seem to have stumped the Ozgridians. No responses to my post about calculating overtime in a pivot table. Perhaps a pivot table is the wrong approach. Please check out the original post and let me know if you have a better solution. Thanks!
See:
http://www.ozgrid.com/forum/showthread.php?t=148038
See:
http://www.ozgrid.com/forum/showthread.php?t=148038