• Hi All

    Please note that at the Chandoo.org Forums there is Zero Tolerance to Spam

    Post Spam and you Will Be Deleted as a User

    Hui...

  • When starting a new post, to receive a quicker and more targeted answer, Please include a sample file in the initial post.

Search results

  1. Hans Öjes

    The result of a formula must be multiples of x

    The problem is solved. Should I close the thread somewhere?
  2. Hans Öjes

    The result of a formula must be multiples of x

    Thanks. An even simpler solution
  3. Hans Öjes

    The result of a formula must be multiples of x

    Thanks, works perfect
  4. Hans Öjes

    The result of a formula must be multiples of x

    Hi. I am wondering how to force the result of a formula to only show multiples of a certain number. For example. If the multiple =6, and the formulas result is 4.5, it should display 6. If the result is 7.5, it should display 12 1.2 => 6 5.5 => 6 6.5 => 12 8 => 12 11.5 => 12 14 => 18 18.2 => 24...
  5. Hans Öjes

    Backwards planning with a schedule

    Sorry, I missed that this finishtime was at a weekend. My misstake, it works fine within shop hours
  6. Hans Öjes

    Backwards planning with a schedule

    Sorry, missed that. My misstake, it works fine within shop hours
  7. Hans Öjes

    Backwards planning with a schedule

    Hi. I found a missmatch between P45cal & Narayan's model Finish 2017-11-04 09:00 runtime 19:30 open 07:00 close 16:45 Result: Narayan 2017-11-01 16:45 P45cal 2017-11-02 16:45 They are 1 day apart at this specific scnenario. I believe P45cal's is miscalculating this time
  8. Hans Öjes

    Backwards planning with a schedule

    Now I have tested Narayan against p45cal for a complete week, using run times 00:20, 09:30, 55:25 and both methods shows the same results. (Vietm's solution looped for me at 00:20 so I had to remove it from the comparsion). I will work with the data during the weekend, and hopefully we are done...
  9. Hans Öjes

    Backwards planning with a schedule

    I entered a low runtime in Narayan's model (00:20), and it calculated the start time as being > finish time, so something is still wrong there
  10. Hans Öjes

    Backwards planning with a schedule

    Thanks to all 3 of you: Narayan, P45cal & Vletm
  11. Hans Öjes

    Backwards planning with a schedule

    I can fix that by extending the number of columns, looks great. thanks a lot!
  12. Hans Öjes

    Backwards planning with a schedule

    It seems to be working just fine! You are a star!! Now the last thing. I need to be able to enter a runtime > 23 hours. Is that possible to fix?
  13. Hans Öjes

    Backwards planning with a schedule

    To reply to your question 2: Yes, that would work fine
  14. Hans Öjes

    Backwards planning with a schedule

    Hi. I looked further into checking the calculations. I have made "Manual" calculattions of the total time used for different cases (In rows BF_BU) The first 5 works correct, the I skipped those with the previously detected error, and then there are miscalculations again. Please check and see if...
  15. Hans Öjes

    Backwards planning with a schedule

    Thanks. I have tested and the formula crashes when the finishtime is earlier the the opening hours of the shop. I have extended the fomulas to a table with different starting time over a week with 2 hours incremental steps, and done a gant-chart to grafically graps what is happening. Please have...
  16. Hans Öjes

    Backwards planning with a schedule

    I am trying to plan backwards based on the followingas input: - Planned finish time (yy-mm-dd hh:mm) - Runtime (hh:mm) [Time it takes to manufacture the widget] - Shop opening time (hh:mm) - Shop closing hours (hh:mm) What I am looking for is a formula that can calculate backwards to a planned...
Back
Top