ryan green
New Member
Ill explain the necessary information fully, for the EPC if it is in category A,B,C or D it qualifies for a higher rate anything below is a lower rate.
Any solar PV fitted before 03/03/2012 or one fitted on a high EPC band at any date qualifies for the higher FIT rate. any solar PV system fitted on a low EPC home or fitted on or after 03/03/2012 qualifies for the lower FIT rate. Systems that have not been certified will not be eligible. Systems installed before 01/04/2010 are not eligible . The actual FIt rate must be calculated and the formula must go in cell E23-25 which must change to red if not eligible and if it does qualify it must turn green and display the correct FIT rates that are on sheet 2. i know that the formula will most probably contain IF statements and nested IF's along with a Vlookup.
Many thanks
Ryan
Any solar PV fitted before 03/03/2012 or one fitted on a high EPC band at any date qualifies for the higher FIT rate. any solar PV system fitted on a low EPC home or fitted on or after 03/03/2012 qualifies for the lower FIT rate. Systems that have not been certified will not be eligible. Systems installed before 01/04/2010 are not eligible . The actual FIt rate must be calculated and the formula must go in cell E23-25 which must change to red if not eligible and if it does qualify it must turn green and display the correct FIT rates that are on sheet 2. i know that the formula will most probably contain IF statements and nested IF's along with a Vlookup.
Many thanks
Ryan